Construction of Drainage Structures along the Bellamy Canal Mahaicony, Region No 5 (Lots 1–6) — Lot 2
Ministry of Agricultureparent of National Drainage and Irrigation Authority (NDIA) — Construction of drainage structures along the Bellamy Canal Mahaicony, Region No 5, comprising Lots 1 to 6.
- Location
- Closing date
- Closed 17 Apr 2025